Quantcast
Browsing all 3184 articles
Browse latest View live

Comunication user locking SoCo processing

Hi experts, I'm on a 7.0 EHP2 SRM facing the following issue.I have a SC on SoCo in step 1. When I selec this SC to step 2 I get back the following message BBP_PD045 (User JOBUSER is already processing...

View Article


SRM7.0 EHP3 UPGRADE

Hi All, We are upgrading SRM5.0 to SRM7.0 EHP3 on linux x86_64bit with oracle.We are facing an issue with DVD kit for BS7I2013 kernel. In SUM extraction phase the DVDs are not accpeting.As per the  SRM...

View Article


Attachment URL

Hello, We are on SRM 7 EHP1. Our Intention is to send the attachment URL of PO to PI. For that we have avtivated service in SRM /default_host/sap/ebp/ Docserver. I can see a link in BBP_PDATT table...

View Article

Why the changed PR not transferred to SRM

Dear expert, I am in SRM 713.Using the plan-driven scenario and PI integration between SRM and ECC.For the PDP, I realized the BADi, ME_REQ_SOURCE_CUST .For the PR creation, it is success to post the...

View Article

Document headern text

Hi,  would like that the field 'Documenet header text ' in the MB1B ,in the movment type 343 and 344 be mandatory.  Thanks v.yazhini

View Article


How to change UI headers and button color in addon 1.0

Hello Gurus We are trying to implemnt ADDON 1.0 in SRM. One of our client's request is to change the UI look  a bit. For example: How can we change button color from yellow (when it's the next step in...

View Article

Transfer PO SRM x ECC.

Friends, I need a help.    We are setting the stage for the classic SRM 7 EHP03 with ECC 6 EHP7. After creating the cart or even the creation of the document request is not migrated to the backend...

View Article

SRM PO fails in backend due to vendor not belonigng to company code

Dear AllPlease advise the solution for the issue on how we can build a check in the system so that when a SC is placed it is checked from ECC if the vendor belongs to the particular company code or not...

View Article


Item released information for PO items - SRM ext. classic

Hi gurus, a very, simple question. What's the most effective way to understand, in an Extended classic scenario, that a specific item has been released/distributed to an ECC backend (therefore, that a...

View Article


EDI Standard used in SRM-SUS for Purchaser - Vendor Document Exchange?

Hi Forum, For exchange of electronic documents like ASN, PO, PO Response, Confirmations etc. between buyer and seller, which EDI standard is used in SRM-SUS? Say there are two different vendors one...

View Article

Roll out queries

Hi, I am new to SAP SRM. We have One SRM pointed to different backend systems. On doing rollouts for new country, will the same issues in SRM be repeated again like which we have faced already for...

View Article

Service PR's are failed to reach SRM

Dear Experts,  We are facing the problem with service PR's. Some of the Service PR's triggered from ECC to SRM, Fails at SRM with the following Error" Error during ISO code conversion of LANGUAGE on...

View Article

Modify E-Mail content for ROS self registration

Dear SRM Expert,  Can you please suggest how to change following 1.Modify the content of the email sent to supplier at the time of initial registration with questionnaires  URL?We checked Change of...

View Article


SRM - HR Org Structure Integration

Hi Sap Gurus, Could you please explain the steps for integrating SRM with HR org structure to replicate the Hr Org Data to SRM.. What are the steps/ configuration settings required in SRM and ECC to...

View Article

Error in Bidder Portal ?

Dear Sir, My Client is using PPS procurement. After publish of RFx. the bidder want to take the print preview of RFx, he is getting Error as below. " TEXT Y109 ID ST Language EN not found." Please...

View Article


Transfer Attachment from ECC PR to SAP SRM SC

Hi all, I am working in ECC EHP6 , SRM 7.02. We are transferring PR from SAP ECC to SRM through PI system. I need to transfer an Attachment from ECC PR to SAP SRM SC. Is that a standard or we need to...

View Article

ROS registration Mail content

Dear all, We are using SRM 7.02 ROS in SUS system, with Webdynpro. Once the supplier filled the information and click Send. The infromation is registered in ROS system.In the same time the mail is send...

View Article


PR status as 'Rejected' in External Source tab

Hi, Transferring the PR through PI with the BADI configuration.  Since when we reject the SC that is created from PR in the SOCO, the Status will not be updated, where as the CLOSED field in PR is...

View Article

MDM SRM Catalog

Hello ,  I am trying to open a an MDM catalogue from SRM 7.1.  However when I click on the Catalogue instead of it opening it is opening the UI Configuration Tool  ? (please see attached photo) Can...

View Article

Image may be NSFW.
Clik here to view.

Attachments with KPRO / Content Server

Hello, I am trying to store Shopping Cart's attachment in KPro using Archive Link on SRM 5.0 and ECC 6.0. Here find what I did: 1. I created my Content Repository ZA (CSADMIN & OAC0) - All is...

View Article
Browsing all 3184 articles
Browse latest View live