Hi all,
In our current SRM4 with backend ECC 6.0 EhP4, the backend system was defined as ERP_2.0. After shopping cart get approval and PO generated at backend, both the PO creator and item requisitioner are equal to shopping cart creator.
We are upgrading to SRM7 and exploring the service procurement scenario (transfer service hierarchy) between SRM7 and backend ECC 6.0 EhP4. After we defined backend system as ERP_4.0 (LOG_MM_P2PSE_1 activated EhP 4) and setup PI, the PO was successfully created at backend via XML message. However, we noticed that the PO creator and item requisitioner were WF-BATCH but not the shopping cart creator. Is there any setup that can resume both the PO creator and item requisitioner equal to shopping cart creator?
We also tested in SRM7 to define backend system as R/3_4.6C (does not require PI), then the backend PO creator and item requisitioner are equal to shopping cart creator.
Regards,
Donald