Dear all experts.
We are facing a new requirement on SRM.
the scenario is SC -> RFX -> RFX response -> Contract.
Direct material purchasing.
Requirement: the line item product ID may need to be changed once the RFx response is awarded, meaning a change on contract line item product ID.
I checked the contract document created from RFx response, the product ID field is protected from modification.
Are there anyway to change the product ID on contract without breaking the line item linkage?
If not.. are there any BADI which can disable the field protection?
Or.. do you have any better solution?
Thanks!