Dear all,
I'm having an issue regarding a Contract in SRM.
There is a contract with have the validity 18.12.2014 to 28.02.2017 , but that status of the contract is expired .
The contract has three version all are inside the valid period.
User created created two PO and now deleted on Line item level. Later the SC was rejected from the SOCO.
We have checked the release Quantity of the contract for both line item 518.871,000 and 463.602,000 respectively .
Please help to check why the status is not released and released quantity is not zero.
Kind Regards.
Raúl