Hello experts,
Message bbp_pd 047 Item 001 WBS element budget exceeded is shown during SC creation, but during PO change in SRM portal this error is not shown. As a result the PO is saved in SRM but cannot be transferred to ECC because of the budget exceeded error. Why could this be happening?
Thanks in advanced,
Jack