Dear All,
We are using plan driven procurement where the demand for non-stock item has to be sourced via SRM. Our set-up is SRM 7.0 Classic Scenario with SP 0005 and ECC 6. We already have a working system with SRM being used for sourcing of non-stock material. We need to implement the following scenario in our system.
1
- Purchase requisition created from PM order needs to create Shopping Cart in SRM. The shopping cart needs to create PO back in ECC i.e external requirement for SRM, but the requisition shouldn’t be copied into SRM and rather used to push the requirement into ECC.
- Updates to the Purchase requisition needs to reflect back in SRM shopping cart.
I have gone through some useful material available in SCN on the issue and referred the SAP Note 648074. I need some clarification as under.
1.
- As per note 648074 this will be achieved by activating the extended classic scenario. Does this means for the Purchase requisitions generated from PM order will have a copy in SRM as in extended classic scenario? What we need is to have is that the Purchase requisition information be used for creation of shopping cart in SRM and not have the PR copied into SRM.
- What are the additional Business objects and BADIs that we would need to activate in SRM and ECC to achieve the objective as mentioned in scenario above.
- Is it possible to include changes in the purchase requisition into the SRM Shopping cart
- Additionally, we also need to transfer attachments in Shopping Cart into SRM.
Any help in this regards will be much appreciated.
Best Regards
Indrajit Dutta Choudhury